Optimale Blockauswahl bei der Kraftwerkseinsatzplanung
The paper addresses the unit commitment problem in power plant operation planning. For a real power system comprising coal and gas fired thermal as well as pumped storage hydro plants a largescale mixed integer optimization model for unit commitment is developed. Then primal and dual approaches to solving the optimization problem are presented and results of test runs are reported.
Files in this item